The BSR's Gateway 2 has a high first-time failure rate. Here are 10 tips from our experience to help your application succeed.. Gateway 2 Success Tips 1. Start Early The BSR application takes 12 weeks minimum. Start preparing 6 months before intended construction start. 2. Engage the BSR Pre Application The BSR offers pre application meetings — use them to understand expectations. 3. Complete Fire Strategy First The fire strategy must be complete and cover all aspects of Part B before submission. 4. Competence Declarations All designers must provide competence declarations — ensure they're genuinely qualified. 5. Change Control Plan Have a robust change control plan from day one — the BSR expects this. 6. Construction Control Plan Detail how fire safety features will be inspected during construction. 7. Digital Records Start the golden thread from design stage — not after completion. 8. Prescriptive First Demonstrate compliance with prescriptive guidance where possible. Use fire engineering only where necessary and supported by robust evidence. 9. Third Party Review Have your fire strategy independently peer reviewed before submission. 10. Respond Promptly The BSR will ask questions — respond quickly and comprehensively to avoid delays. For Gateway support, contact us.