Automatic Opening Vents (AOVs): UK Requirements and Maintenance

AOVs are fundamental to natural smoke ventilation in UK buildings. We explain requirements, common faults, and maintenance.. AOV Requirements Where Required Head of common stairways in residential buildings over 3 storeys Common corridors with no alternative ventilation Minimum free area: 1.0m² (stairway AOV), 1.5m² (corridor AOV) Activation Smoke detector activation (automatic) Break glass unit at ground floor (manual override) Fire alarm system interface Maintenance Monthly functional test Annual full service by specialist contractor Battery backup verification Weatherseal and hinge inspection Control panel and detector testing For smoke ventilation maintenance, contact us.