Project
Decision
Agreed by the project team
Existing strategy / report index
One line per document
Design / as-built / observed
Plans available
Facts and assumptions
Design interfaces to discuss
Surveys and access
Deliverables
Next step
Not an automatically generated statutory deadline
Before you send this
What information would materially change the scope or price? Ask the appointed specialist before treating an assumption as a fact.