What changes the cost and extent of a compartmentation survey?
Start with the floors, compartment lines and service penetrations that need checking. Plans help locate each inspection; concealed construction may need further investigation before a finding can be made.
The quotation depends on floors and lines covered, plans, access, sampling and separately agreed opening-up and reinstatement. Specify who authorises and carries out intrusive work, occupied-area constraints and the required defect-record format.
A defect schedule can identify the floor, room or grid line, the penetration, the photograph and any access limit. These illustrative fields show how the site team can find the same defect again and plan the next inspection or repair.
Compartmentation is one of the most important passive fire protection measures in a building. Fire-resisting walls and floors divide the building into compartments designed to contain a fire in the compartment where it starts for a specified period. When the boundaries are continuous and their openings properly protected, they restrict fire spread and help limit the movement of smoke. A compartment may contain several rooms. A stated fire-resistance period describes performance under specified test conditions; it does not guarantee the duration of a real fire.