Applicability before advice
The first output is whether an obligation applies at all to this building, use, height and phase, because most wasted effort starts with an assumed route.

Magnus Opifex Seven · UK fire engineering
Owners and project teams receive a technical review of applicable fire-safety duties, regulatory routes and next steps.
Photograph: Battersea Power Station · wider team fire-engineering experience, not evidence of this service instruction
We will clarify your scope before preparing a written fee proposal.
Know which obligations apply, who owns them and what evidence they need.
A written route map of the fire-safety obligations that apply to a specific project or building: the applicable duties for the relevant jurisdiction, the evidence each one requires, who owns that evidence and where the gaps currently are. This is technical fire-safety consultancy, not legal advice and not a regulatory determination.
A written route map of applicable fire-safety obligations, evidence requirements, evidence owners and current gaps.
Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.
For owners and project teams unsure which fire-safety duties or regulatory route apply to their building and proposed work.
A scoped technical review maps applicable duties, information gaps and next steps. It is not legal advice or a regulator decision; EWS1 signing is a separate instruction.
Start with the UK nation, address, use, height if known and proposed work. Describe the question or share the correspondence you have; unknown facts can be identified during scoping.
UK fire-safety obligations come from several directions at once. For buildings in use in England and Wales the Regulatory Reform (Fire Safety) Order 2005, as amended by the Fire Safety Act 2021, places duties on the Responsible Person, and the Fire Safety (England) Regulations 2022 add specific requirements for certain multi-occupied residential buildings. For building work, the Building Regulations and the Building Safety Act 2022 apply, with additional procedures for higher-risk building work in England. Part 4 of the Building Safety Act 2022 places in-occupation duties on the Accountable Person and Principal Accountable Person for higher-risk buildings in England. Scotland and Northern Ireland have separate statutory routes.
A route map records which of these actually apply to the specific building, use, height, phase and type of work, what evidence each obligation requires, and who in the project or estate owns that evidence. Golden-thread expectations mean the information has to be identifiable, accessible and kept up to date, not merely produced once.
British Standards and published guidance — for example BS 9991, BS 9999, PAS 79 or PAS 9980 — are standards and guidance, not legislation. Where a project follows one, that is recorded as a design or assessment decision with its own justification.
For higher-risk building work in England, the building control approval application made to and determined by the Building Safety Regulator is handled as a separate, dedicated scope: see the Gateway 2 building control support service page.
Scoped: written quotation against a defined scope
Mapped: obligations, evidence and owners recorded
Jurisdiction: route confirmed per project, never assumed
A written route map of the fire-safety obligations that apply to a specific project or building: the applicable duties for the relevant jurisdiction, the evidence each one requires, who owns that evidence and where the gaps currently are. This is technical fire-safety consultancy, not legal advice and not a regulatory determination.
A written route map of applicable fire-safety obligations, evidence requirements, evidence owners and current gaps.
A building or project may be a higher-risk building and the position needs confirming
Planning, building control or regulator comments raise fire-safety obligations
Safety case, golden thread or dutyholder responsibilities are unclear
External wall, cladding or legacy compliance questions need a route rather than an opinion
A portfolio needs one consistent view of which duties apply where
An independent technical route map is needed before appointments are fixed
Regulatory applicability review for the fire-safety scope
Route map of the fire-safety obligations relevant to the project or building
Evidence checklist for each obligation in the agreed scope
Responsibility matrix showing who owns which fire-safety evidence
Fire safety information and golden-thread gap analysis
Technical briefing notes and reviewer response support within scope
The first output is whether an obligation applies at all to this building, use, height and phase, because most wasted effort starts with an assumed route.
Every obligation in the map is written against the party who must hold its evidence, so gaps surface as accountable actions rather than shared anxiety.
What the route map does not decide — legal interpretation, approval, enforcement — is stated in the document itself.
Jurisdiction, building category, project phase and the fire-safety scope are defined in writing before a fee is quoted.
Applicability reviewed before scope is fixed
Evidence owners recorded explicitly
Assumptions and limitations written into the output
The output records the fire-safety obligations and evidence gaps identified from the information supplied. Determinations, approvals and legal interpretation remain with the relevant authorities and the client's own advisers.
This is technical fire-safety consultancy. It is not legal advice and not a legal determination; legal interpretation is a matter for the client's own legal advisers.
We are not a building control authority and we are not the Building Safety Regulator. Applicability, validation, approval and enforcement are decided by the relevant authorities.
We do not take on Responsible Person, Accountable Person, Principal Designer or Principal Contractor duties.
We do not submit or obtain approvals on a client's behalf and no approval outcome, timetable or cost is guaranteed.
EWS1 form signing is not included in this legislative-consultancy service. Any EWS1 request requires a separate instruction, with scope, signatory competence and professional indemnity cover confirmed before appointment.
External wall assessment work under PAS 9980 is a separate scope and is only undertaken where separately agreed in writing.
The route map reflects the information supplied; where information is missing the gap is recorded as a gap, not assumed.
Fees and programme are confirmed in a written quotation after the scope is agreed.
Developers and clients commissioning building work
Building owners and freeholders
Managing agents and estate teams
Registered providers and housing operators
Design teams needing the fire-safety obligation route confirmed
Higher-risk buildings in England, in design or in occupation
Legacy and existing assets with unclear fire-safety information
A clear map of the applicable fire-safety route, evidence requirements and project interfaces.
Defined dutyholder evidence and gaps for buildings in occupation or planned work.
A written responsibility matrix for coordinating technical evidence without treating it as legal advice.
01
We identify the building category, applicable duties, approval bodies and fire-safety obligations for the relevant jurisdiction.
02
We compare available information against what reviewers and dutyholders need.
03
We set out the sequence of decisions, documents and responsibilities for the agreed fire-safety scope.
04
We help shape technical explanations where comments arise within the fire-safety scope.
05
We connect design-stage fire-safety evidence to future management and golden-thread expectations.
A simplified view of the sequence described above. The actual steps, inputs and outputs are confirmed in the written scope for your project.
Explore the scope recorded for each project.
London, UK
Building Safety Act · Gateway 1
Our major-project work brings together a package of consultancy services. Explore these selected projects for their building context and our role. For your project, the service scope is agreed against its jurisdiction, stage and information available.
Cumbria, UK
Fire-engineering support across building packages within the Sellafield estate: site conditions, structural fire protection, compartmentation, fire stopping, doorset interfaces and fire-strategy coordination.
London, UK
Our team provided fire engineering consultancy on Phases 1, 2 and 3 of the Battersea Power Station redevelopment. On Phase 3, our work included fire engineering strategy and review of cladding and façades.
London, UK
Independent third-party fire-engineering review of refurbishment and reconditioning in operational hospitals.
Building Safety Act & Legislative Consultancy
Use this as a checklist before you ask for a quotation. Tick what you hold; unknown items can be listed as unknown. Nothing here is saved.
Building address, use, storeys, approximate height and jurisdiction Whether the question concerns building work, a building in occupation, or both Project stage, phase and the type of work proposed Existing fire strategy, fire risk assessment and fire-safety information held Any regulator, building control, planning or enforcement correspondence Current appointments and who holds which dutyholder role
Request a legislative consultancy quoteMagnus Opifex Seven brings fire engineering, project governance and commercial judgement together. Alina Scarlat brings more than 22 years in fire safety and fire engineering as of November 2026, beginning with an apprenticeship in June 2004. Our team’s career project experience spans three continents. From existing buildings to healthcare estates, heritage assets and nuclear facilities, we turn complex fire-safety questions into written advice, coordinated requirements and practical next steps.
Meet Magnus
Technical Director
Alina Scarlat, Technical Director, leads the engineering assessment, performance requirements, evidence review and technical conclusions.

Founder, CEO and Chief Legal Officer
Nicoleta Vasile, Founder, CEO and Chief Legal Officer, reviews legal and contractual risk as project decisions arise: applicable duties, appointment requirements, responsibility, authority to accept changes and escalation where material evidence remains unresolved. Romanian-qualified advocate (avocat), Bucharest Bar since 16 September 2009, with rights of audience before all Romanian courts and an LLM from City, University of London. UK client representation is separately scoped with an appropriately qualified UK adviser where required.
Projects may need several coordinated instructions; these are not automatically included in every appointment.
No. We provide technical fire safety and compliance consultancy, not legal advice or legal determinations. Where legal interpretation is required, the client instructs their own legal advisers.
Yes, within a defined scope: fire-safety evidence review, gap checks, technical narrative and response support. For higher-risk building work in England, see the Gateway 2 building control support service page. We do not manage or own the building control application itself.
No. The client and the relevant dutyholders own the application, appointments and compliance duties. The Building Safety Regulator or the relevant building control authority decides validation, approval or rejection.
No. EWS1 form signing is not included in this legislative-consultancy service. Any EWS1 request is reviewed as a separate instruction, with the scope, signatory competence and professional indemnity cover confirmed before an appointment is agreed. EWS1 is a valuation and lending form, not a life-safety certificate or a fire risk assessment.
Yes. We can help map fire safety issues, evidence gaps and practical next steps for existing or legacy assets, within an agreed scope.
No. England, Wales, Scotland and Northern Ireland have different statutory routes. The Building Safety Regulator higher-risk building control regime applies in England. The applicable route is confirmed per project.
Yes. We can clarify the fire-safety evidence needed for the project's stage and the building's status. Gateway 2 concerns building control approval for relevant higher-risk building work in England; the in-occupation safety case is a separate duty. We scope our contribution and identify the interfaces with the client's other advisers.
Southwark Council’s planning committee report identifies Magnus Opifex Seven Ltd as the practice that produced the fire strategy. It records that detailed fire-safety matters would be assessed at Gateway 2 and during building control. That tells a buyer exactly which stage this public record covers.
Ask about a relevant reference or anonymised deliverable; we check availability and permission to share.
Provide the building use, height and storeys, the jurisdiction, the phase, the type of work and the fire-safety information you already hold. We will respond with the scope required for a written quotation.
Request a legislative consultancy quote