Battersea Power Station — Phases 1, 2 and 3, London, UK — project context

    Magnus Opifex Seven · UK fire engineering

    Fire Safety Management for UK Buildings

    Responsible persons and building managers can commission a management review or plan covering duties, procedures, records and actions.

    The fire-risk action and evidence worksheet is a practice resource for recording actions and review evidence.

    Photograph: Battersea Power Station — Phases 1, 2 and 3

    Discuss fire safety management support

    We will clarify your scope before preparing a written fee proposal.

    Add project details or phone (optional)

    Briefly describe the building, proposed work or decision. Do not include confidential information or attach documents here.

    Your role (optional)

    No obligation. Your details help us scope the work properly. We’ll respond by email.

    Prepare a detailed project brief

    Selected clients and project experience

    • Sellafield Nuclear Facility
    • Battersea Power Station
    • Co-op Live
    • Wimbledon Quarter
    • The Triangle
    • Google Data Centres (3)
    • Google Bay View (HQ)
    • Novotel
    • Westminster City Hall
    • Chelsea and Westminster Hospital
    • Wembley Stadium
    • Tottenham Hotspur Stadium
    • Etihad Stadium (Manchester City)
    • Stamford Bridge (Chelsea FC)
    • Craven Cottage (Fulham FC)
    • Sports Stadium 2, Qatar
    • Allianz Stadium, Twickenham
    • Emirates Stadium (Arsenal)
    • King Power Stadium (Leicester City)
    • Coca-Cola
    • Network Rail
    • TATA Group
    • Bain & Company
    • UBS
    • McLaren Group
    • Romulus Construction
    • Hermes
    • Collins Construction
    • Southwark Council
    • UAL — University of the Arts London
    • St Paul's Girls' School
    • Northampton Partnership Homes
    • BBC
    • Qatari Diar
    View projects

    Turn the fire strategy and assessment into everyday control.

    Responsibilities, procedures, maintenance arrangements and action tracking for occupied buildings and portfolios.

    Reports only help when their requirements reach the people running the building. Magnus supports owners, operators and managing teams in organising responsibilities, procedures, maintenance information and fire-safety actions around the premises they control.

    20+ years
    Senior team experience
    3 continents
    Team project experience
    £10B+
    Portfolio development value
    900+
    Completed projects

    Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.

    Wider major-project package experience

    Selected wider fire-engineering commissions. Read the overviews for Magnus’ appointed role and speak to us about the management support required for your building.

    Sellafield estate

    Defined fire-engineering building packages, site and evidence reviews, and technical coordination.

    Read project overview

    Battersea Power Station — Phases 1, 2 and 3

    Our team provided fire engineering consultancy on Phases 1, 2 and 3 of the Battersea Power Station redevelopment. On Phase 3, our work included fire engineering strategy and review of cladding and façades.

    Read project overview

    Hillingdon and Mount Vernon Hospitals

    Independent third-party fire-engineering review of refurbishment and reconditioning in operational hospitals.

    Read project overview

    Connect the documents with the operation

    We review the strategy, assessments, existing procedures and responsibilities to identify what the management system needs to deliver. The instruction may cover a single building, a changing operational site or a multi-building portfolio.

    Practical outputs

    A management review and gap schedule; responsibilities and escalation arrangements; relevant policy and procedure development; schedules for checking, maintenance and review; and a structure for tracking actions, evidence and changes. Scope and specialist interfaces are agreed in writing.

    Responsibilities stay with the dutyholder

    Management support complements the fire risk assessment and strategy. It does not transfer statutory responsibility or certify the building. Staff training delivery, system maintenance and specialist inspection are included only if explicitly part of the appointment.

    A coordinated process

    1. 01

      Understand the arrangements

      Review the premises, strategy, assessments and existing operational arrangements.

    2. 02

      Map named responsibilities

      Connect requirements with named responsibilities and escalation routes.

    3. 03

      Develop the agreed documents

      Review or develop the policies, procedures and records within the appointment.

    4. 04

      Plan implementation and review

      Help the team organise actions, evidence and review points. Records and actions remain under the dutyholder’s control.

    How the evidence becomes a written output

    A simplified view of the sequence described above. The actual steps, inputs and outputs are confirmed in the written scope for your project.

    Three-step diagram: current duties and records, comparison of procedure with actual use and task owners, management arrangements and evidence map
    Illustrative process for fire safety management, not a project record. Magnus explanatory illustration.

    Major-project experience

    Our major-project work brings together a package of consultancy services. Explore these selected projects for their building context and our role. For your project, the service scope is agreed against its jurisdiction, stage and information available.

    • Sellafield Nuclear Facility

      Cumbria, UK

      Fire-engineering support across building packages within the Sellafield estate: site conditions, structural fire protection, compartmentation, fire stopping, doorset interfaces and fire-strategy coordination.

    • Battersea Power Station — Phases 1, 2 and 3

      London, UK

      Our team provided fire engineering consultancy on Phases 1, 2 and 3 of the Battersea Power Station redevelopment. On Phase 3, our work included fire engineering strategy and review of cladding and façades.

    • Hillingdon and Mount Vernon Hospitals

      London, UK

      Independent third-party fire-engineering review of refurbishment and reconditioning in operational hospitals.

    What we need from you to scope the work.

    Fire Safety Management for UK Buildings

    Use this as a checklist before you ask for a quotation. Tick what you hold; unknown items can be listed as unknown. Nothing here is saved.

    Request a scoped quotation

    Executive fire-safety briefing for senior decision-makers

    C-Suite Fire Briefings — a tailored fire-safety briefing for boards and senior leadership, focused on governance, duties, risk, evidence, decisions and next actions; scope and fee are agreed in writing after a free initial consultation.

    • Each briefing is prepared for one organisation and one leadership team. There is no standard programme.
    • Scope, format and fee are agreed in writing after a free initial consultation.
    • Professional advice is engagement-specific and evidence-specific: what we can say depends on the information made available to us.
    • The briefing does not constitute regulator approval, certification, legal advice or statutory sign-off.
    • The briefing is not a substitute for project-specific fire engineering work, a fire risk assessment or a fire strategy.
    • Nothing is charged before you accept a written fee proposal.

    Fee confirmed in writing after scoping.

    Before you enquire

    Start with the building or portfolio, operating model, existing reports and the management problem you need to solve.

    Discuss fire safety management support

    The people behind the advice

    Magnus Opifex Seven brings fire engineering, project governance and commercial judgement together. Alina Scarlat brings more than 22 years in fire safety and fire engineering as of November 2026, beginning with an apprenticeship in June 2004. Our team’s career project experience spans three continents. From existing buildings to healthcare estates, heritage assets and nuclear facilities, we turn complex fire-safety questions into written advice, coordinated requirements and practical next steps.

    Meet Magnus
    Alina Scarlat

    Alina Scarlat

    Technical Director

    Alina Scarlat, Technical Director, leads the engineering assessment, performance requirements, evidence review and technical conclusions.

    Nicoleta Vasile

    Nicoleta Vasile

    Founder, CEO and Chief Legal Officer

    Nicoleta Vasile, Founder, CEO and Chief Legal Officer, reviews legal and contractual risk as project decisions arise: applicable duties, appointment requirements, responsibility, authority to accept changes and escalation where material evidence remains unresolved. Romanian-qualified advocate (avocat), Bucharest Bar since 16 September 2009, with rights of audience before all Romanian courts and an LLM from City, University of London. UK client representation is separately scoped with an appropriately qualified UK adviser where required.

    Questions before commissioning

    Can support cover a portfolio?

    Yes. The instruction identifies the buildings, operating arrangements, common requirements and site-specific responsibilities.

    Does management support replace the FRA?

    No. It helps translate the assessment and strategy requirements into organised actions and ongoing control.

    Who remains responsible for fire safety?

    The relevant dutyholders retain their responsibilities. Appointing a consultant does not transfer those statutory duties.

    What records are useful at the start?

    Strategies, assessments, action plans, maintenance schedules, procedures and the current responsibility structure.

    Can support continue after the documents are issued?

    Follow-on review or coordination can be agreed, with the frequency, outputs and responsibilities stated in the appointment.

    Connect fire-safety requirements with everyday control.

    Tell us about the building or portfolio and the management problem to resolve.

    Discuss fire safety management support