Glen House, Hammersmith
RIBA Stages 1–4 fire strategy for office refurbishment, including the fire resistance of an existing concrete waffle slab.
Read project overviewAnalytics measures visits and actions. Separately, Google Ads can link a click to your enquiry and later qualification or contract. Both are optional; you can enquire without choosing.
Optional analytics measures visits and actions. With your permission, Google Ads measurement links an ad-click identifier to your enquiry and later recorded qualification or won decision. No personalised ads or email/phone matching. Enquiries remain available if you decline. You can change either choice at any time. See our Privacy policy.
Optional analytics measures visits and actions. With your permission, Google Ads measurement links an ad-click identifier to your enquiry and later recorded qualification or won decision. No personalised ads or email/phone matching. Enquiries remain available if you decline. You can change either choice at any time. See our Privacy policy.
Privacy choices, enquiry functions and requested account access.
If you grant advertising measurement here, a supported Google ad-click identifier and this notice revision are recorded with the server-observed landing and enquiry times for up to 30 days. They can link your enquiry to a later operator-recorded qualification or won decision for Google Ads measurement, only with a verified import destination. Email and phone matching and personalisation stay off. Changing this choice to off stops new measurement and requests withdrawal of linked permissions from this browser. Business enquiry records are not deleted. Older acceptance is not permission for this new linkage; save your current choice to opt in. See our Privacy policy.
Advertising measurement is off here. Server withdrawal is awaiting acknowledgement; reconnect to complete it.
Your browser’s privacy signal applies. Optional measurement is off.

A design fire strategy report for UK architects and developers planning new buildings, refurbishment or change of use.
Glen House, London · Office-refurbishment fire strategy, RIBA Stages 1–4.
Design stage, evidence and review interfaces are agreed; a report is not regulatory approval.
Glen House, London · RIBA Stages 1–4 fire strategy for office refurbishment
We will clarify your scope before preparing a written fee proposal.
Commission a design strategy while escape routes, compartment lines and protection-system interfaces can still be coordinated. A proposed conversion needs a design basis for the intended use, not simply a record of the building as it stands.
The quotation depends on drawing maturity, occupancy, building height, design stage and the review interfaces. Identify alternative layouts and any question needing separate modelling; changing the design changes the review extent.
The report sets out the design approach, assumptions and coordination decisions. At Glen House, the team reviewed the existing floor’s fire resistance as part of the RIBA Stages 1–4 office-refurbishment strategy.
From a single private house to a mixed-use development, a fire strategy defines the coordinated approach to escape, fire spread and firefighting access. Magnus Opifex Seven helps homeowners, architects and developers develop that approach. The written report records the decisions, assumptions and supporting evidence in a form proportionate to the project.
Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.
Technical Director Alina Scarlat leads the engineering, with more than 22 years in fire safety and fire engineering. Nicoleta Vasile addresses legal and contractual risk; CFO and Strategy Officer Răzvan Vasile provides commercial oversight.
About Magnus Opifex SevenA new home must meet the fire-safety requirements that apply where it is built. For an extension, loft conversion or alteration, the proposed work and its effect on the existing home determine what must be addressed. On a straightforward scheme, coordinated drawings and specifications may provide sufficient evidence. UK law does not prescribe a separate fire strategy report for every home.
We recommend a written report where a decision needs justification or several measures must work together. An open-plan ground floor, for example, can change the escape route from bedrooms above. We can review the plans with your architect, assess the options and explain which measures the chosen layout depends on.
An unchanged existing private home does not automatically need a retrospective fire strategy report. The proposed work, particular risk or evidence gap determines what advice is useful.
Bring us in at feasibility or concept design, typically RIBA Stages 1–2, while your architect can still compare layouts and your cost consultant can price the options. In a house, the position of a stair can determine whether occupants can reach a final exit. On a larger scheme, a smoke shaft needs space on each floor and a coordinated route through the structure.
Resolving those questions before tender or procurement can reduce abortive design work, contractor variations and delays. Coordinating a shaft opening before the slab is cast, for example, can avoid a later structural redesign and alteration of completed work, where the design and evidence support that approach. Early advice can lower the overall project cost and gives the client a better basis for setting the budget. Where additional protection is necessary, there is time to allow for it. The benefit depends on the scheme; no saving or approval outcome is guaranteed.
The stage and engineering question matter. These appointments illustrate refurbishment, site constraints and detailed-design coordination; they do not imply a guaranteed saving for another project.
RIBA Stages 1–4 fire strategy for office refurbishment, including the fire resistance of an existing concrete waffle slab.
Read project overviewRIBA Stages 2–4 fire strategy for houses and flats on a site constrained by boundaries and fire-service access.
Read project overviewRIBA Stages 4–5 fire strategy work, including coordination around risers and voids.
Read project overviewWe identify the applicable requirements, the drawings reviewed and the basis of design. The report covers warning and escape, evacuation, internal linings, compartmentation, structural fire resistance, external fire spread and fire service access as applicable. It explains how detection, suppression or smoke control supports the design and records assumptions about the occupants and building management.
We identify departures from guidance, the evidence supporting them and any decisions still needed. Your proposal sets out the stage of issue, drawings or calculations included, meetings, revisions and any construction or as-built review.
The location and proposed work determine the applicable regulations. In England we assess the relevant requirements of the Building Regulations, including Part B. Wales has its own Approved Document B and building control procedures. In Scotland we use the applicable building standards and Technical Handbooks. In Northern Ireland we assess the relevant requirements of Part E and the guidance in Technical Booklet E. We identify the applicable edition and transition provisions for your project.
England’s building-regulations dutyholder requirements are wider than the higher-risk building approval route. A fire strategy report does not replace the client’s, designers’ or contractors’ responsibilities.
Some projects require a specific submission. For example, an application to construct a new higher-risk building in England requires a fire and emergency file. Wales has a separate higher-risk building control regime. We identify the documents your route requires and confirm which are included in our appointment. Wales introduced its separate higher-risk building control regime on 1 July 2026, subject to the relevant transition provisions. An ordinary fire strategy report is not a substitute for every prescribed submission.
For proposed alterations we assess how the work affects the building and its occupants. If records are missing, a retrospective fire strategy can establish what can be supported by drawings, survey evidence and observed conditions. A fire risk assessment addresses the risks to people in premises in use. We can identify which instruction your question calls for.
The report supports review by the relevant building control body or verifier. That body decides the application. If layouts, materials, systems or assumptions change, the project team should check the effect on the strategy before proceeding. The appointment identifies the review and handover services included.
01
Confirm location, use, work, design stage and next milestone. Identify the requirements and the decisions that could constrain the scheme.
02
Review drawings and options, justify relevant departures and record the requirements, assumptions and unresolved matters.
03
Provide the agreed report and supporting outputs. Confirm who reviews approval submissions, subsequent changes and construction or handover evidence.
Send the site location, proposed use, number of storeys, available plans and the next decision date. Tell us if you are about to fix a layout, submit an application or place an order. Sketch plans are enough for an initial conversation. We will confirm what needs reviewing, what we will issue and the fee.
Projects may need several coordinated instructions; these are not automatically included in every appointment.
No. Applicable fire-safety requirements must be met, but there is no single UK rule prescribing a standalone report for every building. Straightforward drawings and specifications may be sufficient; complex decisions or specific approval routes can require more evidence.
Yes. We can review an open-plan layout, stair, extension or conversion and recommend a written strategy where measures need coordinated justification. An unchanged existing private home does not automatically require a new report.
Bring us in at feasibility or concept design, typically RIBA Stages 1–2, while your architect can still compare layouts and your cost consultant can price the options. In a house, the position of a stair can determine whether occupants can reach a final exit. On a larger scheme, a smoke shaft needs space on each floor and a coordinated route through the structure.
No. The relevant building control body or verifier decides the application. We identify the design basis, evidence and open decisions and provide the review support included in the appointment.
It can help avoid abortive design, variations and alterations to completed work when relevant decisions are resolved early. The benefit depends on the project, evidence and chosen option; a particular saving is not guaranteed.
Check the effect on the strategy before proceeding. A changed layout, material, system or occupancy assumption may require revised analysis or coordination. The written scope identifies the review and handover services included.
The proposed refurbishment retained the commercial building’s shell and introduced a new main entrance. The fire statement records how the ground-floor works affected the exits from the east and west cores. Alina Scarlat, BEng (Hons), wrote the statement for Magnus Opifex Seven Ltd, which authorised it.
At the planning stage, the team had discussed the proposals in principle with building control. Further consultation was still planned. For a similar brief, tell us which layouts you plan to retain, which access routes will change and who is coordinating consultation.
Southwark Council’s planning committee report identifies Magnus Opifex Seven Ltd as the practice that produced the fire strategy. It records that detailed fire-safety matters would be assessed at Gateway 2 and during building control. That tells a buyer exactly which stage this public record covers.
This is a blank Magnus example. An assessor’s finding has a reference and location. The register links it to the agreed action, the person responsible, the due date and the evidence needed at review.
For a strategy, the design team also records assumptions and the evidence needed to resolve gaps.
Illustrative worksheet
The commissioning team uses this blank Magnus worksheet to prepare the fire strategy brief.
Ask about a relevant reference or anonymised deliverable; we check availability and permission to share.
Magnus editorial reading of the original statement. Original statement · pp 1–2, 5 · sections 2–4, 7 (PDF)
Southwark · page 109, paragraph 464 · 25/AP/3804 · 23 March 2026 (PDF) · Ilderton project scope
Tell us the next layout decision, application or procurement date. We will explain what needs reviewing, what we will issue and the fee.
Request a fire strategy quote