Glen House, London · RIBA Stages 1–4 fire strategy for office refurbishment

    Fire strategy reports for UK building projects

    A design fire strategy report for UK architects and developers planning new buildings, refurbishment or change of use.

    Glen House, London · Office-refurbishment fire strategy, RIBA Stages 1–4.

    Design stage, evidence and review interfaces are agreed; a report is not regulatory approval.

    Glen House, London · RIBA Stages 1–4 fire strategy for office refurbishment

    Request a fire strategy quote

    We will clarify your scope before preparing a written fee proposal.

    Briefly describe the building, proposed work or decision. Do not include confidential information or attach documents here.

    Add project details or phone (optional)
    Your role (optional)

    No obligation. Your details help us scope the work properly. We’ll respond by email.

    Prepare a detailed project brief

    Selected clients and project experience

    • Sellafield Nuclear Facility
    • Battersea Power Station
    • Co-op Live
    • Wimbledon Quarter
    • The Triangle
    • Google Data Centres (3)
    • Google Bay View (HQ)
    • Novotel
    • Westminster City Hall
    • Chelsea and Westminster Hospital
    • Wembley Stadium
    • Tottenham Hotspur Stadium
    • Etihad Stadium (Manchester City)
    • Stamford Bridge (Chelsea FC)
    • Craven Cottage (Fulham FC)
    • Sports Stadium 2, Qatar
    • Allianz Stadium, Twickenham
    • Emirates Stadium (Arsenal)
    • King Power Stadium (Leicester City)
    • Coca-Cola
    • Network Rail
    • TATA Group
    • Bain & Company
    • UBS
    • McLaren Group
    • Romulus Construction
    • Hermes
    • Collins Construction
    • Southwark Council
    • UAL — University of the Arts London
    • St Paul's Girls' School
    • Northampton Partnership Homes
    • BBC
    • Qatari Diar
    View projects

    Which fire decisions need resolving before the layout is fixed?

    Commission a design strategy while escape routes, compartment lines and protection-system interfaces can still be coordinated. A proposed conversion needs a design basis for the intended use, not simply a record of the building as it stands.

    The quotation depends on drawing maturity, occupancy, building height, design stage and the review interfaces. Identify alternative layouts and any question needing separate modelling; changing the design changes the review extent.

    The report sets out the design approach, assumptions and coordination decisions. At Glen House, the team reviewed the existing floor’s fire resistance as part of the RIBA Stages 1–4 office-refurbishment strategy.

    From a single private house to a mixed-use development, a fire strategy defines the coordinated approach to escape, fire spread and firefighting access. Magnus Opifex Seven helps homeowners, architects and developers develop that approach. The written report records the decisions, assumptions and supporting evidence in a form proportionate to the project.

    20+ years
    Senior team experience
    3 continents
    Team project experience
    £10B+
    Portfolio development value
    900+
    Completed projects

    Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.

    Technical Director Alina Scarlat leads the engineering, with more than 22 years in fire safety and fire engineering. Nicoleta Vasile addresses legal and contractual risk; CFO and Strategy Officer Răzvan Vasile provides commercial oversight.

    About Magnus Opifex Seven

    Does a single dwelling need a fire strategy report?

    A new home must meet the fire-safety requirements that apply where it is built. For an extension, loft conversion or alteration, the proposed work and its effect on the existing home determine what must be addressed. On a straightforward scheme, coordinated drawings and specifications may provide sufficient evidence. UK law does not prescribe a separate fire strategy report for every home.

    We recommend a written report where a decision needs justification or several measures must work together. An open-plan ground floor, for example, can change the escape route from bedrooms above. We can review the plans with your architect, assess the options and explain which measures the chosen layout depends on.

    An unchanged existing private home does not automatically need a retrospective fire strategy report. The proposed work, particular risk or evidence gap determines what advice is useful.

    Appoint a fire engineer before the layout is fixed

    Bring us in at feasibility or concept design, typically RIBA Stages 1–2, while your architect can still compare layouts and your cost consultant can price the options. In a house, the position of a stair can determine whether occupants can reach a final exit. On a larger scheme, a smoke shaft needs space on each floor and a coordinated route through the structure.

    Resolving those questions before tender or procurement can reduce abortive design work, contractor variations and delays. Coordinating a shaft opening before the slab is cast, for example, can avoid a later structural redesign and alteration of completed work, where the design and evidence support that approach. Early advice can lower the overall project cost and gives the client a better basis for setting the budget. Where additional protection is necessary, there is time to allow for it. The benefit depends on the scheme; no saving or approval outcome is guaranteed.

    Relevant strategy experience

    The stage and engineering question matter. These appointments illustrate refurbishment, site constraints and detailed-design coordination; they do not imply a guaranteed saving for another project.

    Glen House, Hammersmith

    RIBA Stages 1–4 fire strategy for office refurbishment, including the fire resistance of an existing concrete waffle slab.

    Read project overview

    Ceaser Court, Sunbury-on-Thames

    RIBA Stages 2–4 fire strategy for houses and flats on a site constrained by boundaries and fire-service access.

    Read project overview

    30 Cannon Street, London

    RIBA Stages 4–5 fire strategy work, including coordination around risers and voids.

    Read project overview

    What your report covers

    We identify the applicable requirements, the drawings reviewed and the basis of design. The report covers warning and escape, evacuation, internal linings, compartmentation, structural fire resistance, external fire spread and fire service access as applicable. It explains how detection, suppression or smoke control supports the design and records assumptions about the occupants and building management.

    We identify departures from guidance, the evidence supporting them and any decisions still needed. Your proposal sets out the stage of issue, drawings or calculations included, meetings, revisions and any construction or as-built review.

    Which requirements apply to my project?

    The location and proposed work determine the applicable regulations. In England we assess the relevant requirements of the Building Regulations, including Part B. Wales has its own Approved Document B and building control procedures. In Scotland we use the applicable building standards and Technical Handbooks. In Northern Ireland we assess the relevant requirements of Part E and the guidance in Technical Booklet E. We identify the applicable edition and transition provisions for your project.

    England’s building-regulations dutyholder requirements are wider than the higher-risk building approval route. A fire strategy report does not replace the client’s, designers’ or contractors’ responsibilities.

    Some projects require a specific submission. For example, an application to construct a new higher-risk building in England requires a fire and emergency file. Wales has a separate higher-risk building control regime. We identify the documents your route requires and confirm which are included in our appointment. Wales introduced its separate higher-risk building control regime on 1 July 2026, subject to the relevant transition provisions. An ordinary fire strategy report is not a substitute for every prescribed submission.

    What if the building already exists?

    For proposed alterations we assess how the work affects the building and its occupants. If records are missing, a retrospective fire strategy can establish what can be supported by drawings, survey evidence and observed conditions. A fire risk assessment addresses the risks to people in premises in use. We can identify which instruction your question calls for.

    What happens after the report is issued?

    The report supports review by the relevant building control body or verifier. That body decides the application. If layouts, materials, systems or assumptions change, the project team should check the effect on the strategy before proceeding. The appointment identifies the review and handover services included.

    A coordinated process

    1. 01

      Fix the brief before fixing the layout

      Confirm location, use, work, design stage and next milestone. Identify the requirements and the decisions that could constrain the scheme.

    2. 02

      Develop and coordinate the strategy

      Review drawings and options, justify relevant departures and record the requirements, assumptions and unresolved matters.

    3. 03

      Issue and review the defined evidence

      Provide the agreed report and supporting outputs. Confirm who reviews approval submissions, subsequent changes and construction or handover evidence.

    Before you enquire

    Send the site location, proposed use, number of storeys, available plans and the next decision date. Tell us if you are about to fix a layout, submit an application or place an order. Sketch plans are enough for an initial conversation. We will confirm what needs reviewing, what we will issue and the fee.

    Connected lifecycle services

    Projects may need several coordinated instructions; these are not automatically included in every appointment.

    Related services

    Sectors we work across

    Questions before commissioning

    Is a separate fire strategy report compulsory for every UK project?

    No. Applicable fire-safety requirements must be met, but there is no single UK rule prescribing a standalone report for every building. Straightforward drawings and specifications may be sufficient; complex decisions or specific approval routes can require more evidence.

    Can you advise on a single private house?

    Yes. We can review an open-plan layout, stair, extension or conversion and recommend a written strategy where measures need coordinated justification. An unchanged existing private home does not automatically require a new report.

    When should we appoint a fire engineer?

    Bring us in at feasibility or concept design, typically RIBA Stages 1–2, while your architect can still compare layouts and your cost consultant can price the options. In a house, the position of a stair can determine whether occupants can reach a final exit. On a larger scheme, a smoke shaft needs space on each floor and a coordinated route through the structure.

    Does the strategy guarantee building control approval?

    No. The relevant building control body or verifier decides the application. We identify the design basis, evidence and open decisions and provide the review support included in the appointment.

    Can early advice reduce project cost?

    It can help avoid abortive design, variations and alterations to completed work when relevant decisions are resolved early. The benefit depends on the project, evidence and chosen option; a particular saving is not guaranteed.

    What happens if the design changes after issue?

    Check the effect on the strategy before proceeding. A changed layout, material, system or occupancy assumption may require revised analysis or coordination. The written scope identifies the review and handover services included.

    The planning fire statement for 32–36 Loman Street

    The proposed refurbishment retained the commercial building’s shell and introduced a new main entrance. The fire statement records how the ground-floor works affected the exits from the east and west cores. Alina Scarlat, BEng (Hons), wrote the statement for Magnus Opifex Seven Ltd, which authorised it.

    At the planning stage, the team had discussed the proposals in principle with building control. Further consultation was still planned. For a similar brief, tell us which layouts you plan to retain, which access routes will change and who is coordinating consultation.

    The fire strategy for 301–303 Ilderton Road

    Southwark Council’s planning committee report identifies Magnus Opifex Seven Ltd as the practice that produced the fire strategy. It records that detailed fire-safety matters would be assessed at Gateway 2 and during building control. That tells a buyer exactly which stage this public record covers.

    What an action register records

    This is a blank Magnus example. An assessor’s finding has a reference and location. The register links it to the agreed action, the person responsible, the due date and the evidence needed at review.

    For a strategy, the design team also records assumptions and the evidence needed to resolve gaps.

    • Finding reference and location
    • Evidence held / evidence missing
    • Priority assigned by the appointed assessor
    • Action owner and agreed due date
    • Status, completion evidence and review record

    Illustrative worksheet

    The commissioning team uses this blank Magnus worksheet to prepare the fire strategy brief.

    Ask about a relevant reference or anonymised deliverable; we check availability and permission to share.

    Discuss your project

    Tell us the next layout decision, application or procurement date. We will explain what needs reviewing, what we will issue and the fee.

    Request a fire strategy quote