Scope point 01
The question is fixed first
The report states the design question and the acceptance criteria before any scenario is run, so the output answers a decision rather than filling a folder.
Quantified evidence for the design question prescriptive guidance cannot answer.
Scoped
written quotation against a defined modelling question
Documented
inputs, assumptions and limitations recorded
Sensitivity
agreed scenario and sensitivity cases, not a single run
Computational modelling is used when a fire-safety design question cannot be answered clearly by following prescriptive guidance alone. Typical questions concern how smoke moves through a large or connected volume, how long conditions on an escape route remain tenable, whether a smoke-control arrangement performs as intended, and how long occupants realistically take to leave.
A performance-based analysis is carried out within an agreed framework: the question and acceptance criteria are defined first, the design fires and scenarios are justified, the geometry and boundary conditions are built from the information supplied, and sensitivity cases test whether the conclusion survives reasonable changes in assumption. In the UK, performance-based design is commonly framed using BS 7974 and its published documents, with BS 9999 or BS 9991 used where a project follows those routes. These are British Standards and guidance, not legislation.
Modelling supports an argument; it does not replace one. The value of a model depends on whether its inputs are justified and its limitations are stated. Where the information needed to justify an input has not been supplied, that gap is recorded as a limitation rather than assumed.
When this service is useful
Computational modelling of smoke movement, tenability and occupant evacuation for a specific building and a specific design question, delivered as a written technical report with the inputs, assumptions, sensitivity cases and limitations recorded. It supports design development and regulatory review; it does not grant or guarantee approval.
Primary outcome
A written modelling report that states the question, the scenarios examined, the results obtained and the limits of what the results support.
Atria, basements, large-volume or connected spaces
Extended travel distances or a non-standard escape strategy
A decision between natural and mechanical smoke ventilation
A reviewer or approval body has asked for quantitative evidence
A smoke-control or sprinkler interface is being value-engineered
An occupant evacuation assumption needs testing rather than asserting
Typical outputs for this service are listed below. The exact format — report, review notes, survey record or technical position — is confirmed in the agreed appointment, and each records the information supplied, the assumptions used and the limitations that apply.
The scope is set from the building facts, drawings, jurisdiction, project stage and the question the written output needs to answer.
Scope point 01
The report states the design question and the acceptance criteria before any scenario is run, so the output answers a decision rather than filling a folder.
Scope point 02
Inputs, boundary conditions, design fires and limitations are written down explicitly so the analysis can be reviewed and defended.
Scope point 03
Agreed sensitivity cases test whether the conclusion holds under reasonable changes of assumption instead of resting on a single favourable run.
Every stage records what has been supplied, what remains open and what the report can and cannot conclude.
01
We define, in writing, what the modelling must demonstrate and which design or review decision it supports.
02
We agree credible fire locations, growth assumptions, ventilation states and occupant assumptions with their rationale.
03
We build geometry, boundary conditions and outputs from the supplied information and record every assumption made.
04
We run the agreed core and sensitivity cases and check outputs for consistency and anomalies.
05
We translate the outputs into a written conclusion, stating what the results support and where they stop.
A simplified view of the sequence described above. The actual steps, inputs and outputs are confirmed in the written scope for your project.
Recorded basis
The design question, acceptance criteria, scenarios and information supplied are recorded in writing before a fee is quoted.
Result
The output records the scenarios examined, the results obtained from the information supplied, and the limitations that bound them. Approval and regulatory determination remain with the relevant authorities.
Explore the scope recorded for each project.
Fire and Smoke Modelling for UK Buildings
Use this as a checklist before you ask for a quotation. Tick what you hold; unknown items can be listed as unknown. Nothing here is saved.
These are examples of building types, uses and project contexts for which this service scope is suitable. They are scope examples, not a client list or a record of completed instructions.
No. It is most useful when prescriptive guidance cannot answer the design question clearly, or when a reviewer has asked for quantitative evidence. Where prescriptive guidance answers the question, modelling adds cost without adding certainty.
The modelling approach and software are confirmed for each project in the written scope, based on the question being answered, and are stated in the report alongside the version used.
A clearly stated question, justified inputs, agreed sensitivity cases, transparent limitations, and conclusions tied directly to the decision the report supports.
It can, where evidence shows a simpler or better-targeted arrangement still meets the agreed criteria. It can also show the opposite. No saving is promised in advance.
No. Building control, the Building Safety Regulator or the relevant approval body decides the outcome. The report provides evidence for that decision; it does not make it.
Request a written scope
Provide the drawings, the building use, the jurisdiction, the project stage and the specific question or reviewer comment the modelling must address. We will respond with the scope required for a written quotation.
Related services
Use these links when the building question also involves design strategy, operational risk, regulatory route mapping or evidence coordination.
Fire strategy reporting for UK projects
Fire strategy reports for new builds, refurbishments and changes of use across the UK. Send drawings and project details for a scoped quotation.
Explore Fire StrategyRegulatory route-finding
Fire-safety regulatory route mapping for UK projects: applicable duties, evidence gaps and dutyholder responsibilities. Send the project details for a scoped review.
Explore Legislative ConsultancyRisk clarity for responsible persons
Fire risk assessments for commercial, residential and mixed-use buildings in London and across the UK. Send the building details for a scoped quotation.
Explore Risk AssessmentFire Safety & Fire Engineering Consultancy — London, UK
From concept design to regulatory compliance, our fire engineering scope covers fire strategy, fire risk assessment, CFD smoke modelling and Building Safety Act 2022 support. Send project details for a scoped quotation.
Nicoleta Vasile, Baroness of Brattleby
Founder & CEO · Chief Legal Officer · Romanian-qualified Lawyer
Alina Scarlat
Technical Director & Fire Engineer (BEng)
Răzvan Vasile
Co-Founder & Chief Financial and Strategy Officer
Head Office: 167-169 Great Portland Street, 5th Floor, London W1W 5PF
© 2026 Magnus Opifex SEVEN LTD. All rights reserved.