    CFD fire and smoke modelling

    Design teams receive a technical report testing their fire or smoke question, with scenarios, assumptions and results.

    Co-op Live’s mechanical smoke ventilation received independent third-party CFD review.

    Co-op Live, Manchester · independent review of third-party smoke-ventilation modelling

    Discuss your fire and smoke modelling

    We will clarify your scope before preparing a written fee proposal.

    Add project details or phone (optional)

    Briefly describe the building, proposed work or decision. Do not include confidential information or attach documents here.

    Your role (optional)

    No obligation. Your details help us scope the work properly. We’ll respond by email.

    Prepare a detailed project brief

    Selected clients and project experience

    • Sellafield Nuclear Facility
    • Battersea Power Station
    • Co-op Live
    • Wimbledon Quarter
    • The Triangle
    • Google Data Centres (3)
    • Google Bay View (HQ)
    • Novotel
    • Westminster City Hall
    • Chelsea and Westminster Hospital
    • Wembley Stadium
    • Tottenham Hotspur Stadium
    • Etihad Stadium (Manchester City)
    • Stamford Bridge (Chelsea FC)
    • Craven Cottage (Fulham FC)
    • Sports Stadium 2, Qatar
    • Allianz Stadium, Twickenham
    • Emirates Stadium (Arsenal)
    • King Power Stadium (Leicester City)
    • Coca-Cola
    • Network Rail
    • TATA Group
    • Bain & Company
    • UBS
    • McLaren Group
    • Romulus Construction
    • Hermes
    • Collins Construction
    • Southwark Council
    • UAL — University of the Arts London
    • St Paul's Girls' School
    • Northampton Partnership Homes
    • BBC
    • Qatari Diar
    View projects

    Test smoke-control options and turn the findings into design decisions.

    Computational fluid dynamics (CFD) modelling for defined fire and smoke-control decisions, with design support and independent review available as distinct instructions.

    Can the proposed smoke-control system protect the escape route with the space and equipment available? If it falls short, what should the design team change? Magnus Opifex Seven combines advanced fire engineering analysis with fire strategy consultancy to answer both questions. We develop options, test them and work with your designers and contractors to put the selected solution into practice.

    20+ years
    Senior team experience
    3 continents
    Team project experience
    £10B+
    Portfolio development value
    900+
    Completed projects

    Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.

    Technical Director Alina Scarlat brings more than 22 years in fire safety and fire engineering. This describes her wider career; each CFD appointment identifies the modelling and review responsibilities.

    About Magnus Opifex Seven

    What we can help you decide

    Computational fluid dynamics predicts how heat, air and smoke move through a building during a defined fire. We start with what the fire strategy requires the building to do.

    In an atrium, we can compare extract and replacement-air arrangements and assess conditions on the escape routes below. In residential corridors and lobbies, we can examine smoke spread towards the stair as doors open during evacuation. In a basement, car park or plant area, we can assess a proposed ventilation arrangement against the intended use, fire hazard and access strategy. Each study has a defined purpose, whether protecting people during escape or supporting firefighting access.

    How we develop the solution

    We agree the design objective and the criteria for judging it before building the model. We select credible fire locations and growth rates, represent the geometry and system response, and check how sensitive the conclusion is to uncertain inputs. We can examine visibility, heat exposure and the movement of smoke at the locations and times that matter. When evacuation time is part of the question, we compare how long the route remains usable with a separate assessment of how long people need to reach safety, allowing for uncertainty.

    Consider a refurbishment where a lobby fills with smoke before the escape route has served its purpose. A larger fan is one option. We might find that replacement air enters in the wrong place, or that the design assumes a damper opens faster than the equipment allows. We work with the design team on feasible changes, then compare the options against the same performance criteria. You see which change addresses the problem and what the conclusion depends on. This is an illustrative design problem, not a description of a completed remedy at Co-op Live.

    Independent review experience

    The appointment below demonstrates review of another team’s modelling. It is distinct from commissioning us to develop an original CFD model.

    Co-op Live Arena, Manchester

    Our team independently reviewed third-party CFD modelling of the arena’s mechanical smoke ventilation. The engineering question was how the proposed system compared with a natural smoke ventilation reference arrangement.

    Read project overview

    Putting the design into practice

    Once an option is selected, we translate it into fire strategy requirements and agree the changes with the architect, building services engineer and smoke-control specialist. Where our appointment continues through construction, we review coordinated drawings and substitutions, identify what the commissioning team needs to demonstrate, and review the evidence against the design assumptions. If a change on site affects the conclusion, we advise what needs reassessment.

    The report identifies the model basis and version, scenarios, sensitivity studies, criteria, limitations and unresolved actions. Where the evidence supports a preferred option, we explain why and identify the requirements for coordinated drawings, system controls and commissioning.

    Independent CFD review

    If another team has already produced a study, we can review its assumptions, scenarios and conclusions against the fire strategy. We identify what the evidence supports, what needs clarification and which design or modelling actions remain open. Where instructed, we review the author’s response and record the position on each item.

    A coordinated process

    1. 01

      Set the performance question

      Agree who or what must be protected, the locations and time periods, the design criteria and the evidence needed. Consider whether a simpler method is sufficient.

    2. 02

      Compare credible options

      Develop or review the study, examine material inputs and sensitivity, and compare feasible changes against the same criteria.

    3. 03

      Coordinate and follow through

      Record the selected requirements, responsibilities and open actions. Where appointed, review detailed design, substitutions and commissioning evidence; reassess material changes.

    Before you enquire

    Send the current plans and sections, fire strategy, smoke-control proposal and the decision or reviewer comment you need to resolve. For an independent review, include the existing study and tell us which model files are available. We will define the analysis, design support, deliverables and fee for your project.

    Connected lifecycle services

    Projects may need several coordinated instructions; these are not automatically included in every appointment.

    Related services

    Sectors we work across

    Questions before commissioning

    Do we need a CFD model?

    We first consider whether established guidance or a simpler calculation answers your question. CFD is most valuable where the geometry, airflow or interaction between systems materially affects the decision.

    What happens if the proposal falls short?

    We identify where and when it misses the agreed criteria, investigate the cause and develop feasible changes with your design team. We compare the revised options on the same basis and record any remaining shortfall.

    Can you review an existing report?

    Yes. We can undertake a report review, examine native model files or agree an independent rerun where needed. We identify the level of review and the information needed in our proposal.

    What if the design changes on site?

    Send us the revised detail. We check whether it affects a material assumption, such as an opening size, airflow path or fan duty, and advise whether the existing conclusion stands or further analysis is needed.

    What can the commissioning team use?

    For an implementation appointment, we identify the operating conditions on which the strategy relies. These may include extract duty, the sequence and timing of fans and dampers, and the availability of replacement air. The commissioning team can test those requirements and provide the results for review.

    Discuss your project with our fire engineers

    Send the design question and current information. We will distinguish model development, independent review and implementation support in the proposal.