    Fire Safety Remediation Support

    Owners and project teams receive a written review of remediation options, designs and agreed inspection evidence.

    The team’s wider work includes Battersea Phases 1–3, with Phase 3 strategy and façade review.

    Photograph: Battersea Power Station · wider team fire-engineering experience, not evidence of this service instruction

    Request a remediation review

    We will clarify your scope before preparing a written fee proposal.

    Add project details or phone (optional)

    Briefly describe the building, proposed work or decision. Do not include confidential information or attach documents here.

    Your role (optional)

    No obligation. Your details help us scope the work properly. We’ll respond by email.

    Prepare a detailed project brief

    Selected clients and project experience

    • Sellafield Nuclear Facility
    • Battersea Power Station
    • Co-op Live
    • Wimbledon Quarter
    • The Triangle
    • Google Data Centres (3)
    • Google Bay View (HQ)
    • Novotel
    • Westminster City Hall
    • Chelsea and Westminster Hospital
    • Wembley Stadium
    • Tottenham Hotspur Stadium
    • Etihad Stadium (Manchester City)
    • Stamford Bridge (Chelsea FC)
    • Craven Cottage (Fulham FC)
    • Sports Stadium 2, Qatar
    • Allianz Stadium, Twickenham
    • Emirates Stadium (Arsenal)
    • King Power Stadium (Leicester City)
    • Coca-Cola
    • Network Rail
    • TATA Group
    • Bain & Company
    • UBS
    • McLaren Group
    • Romulus Construction
    • Hermes
    • Collins Construction
    • Southwark Council
    • UAL — University of the Arts London
    • St Paul's Girls' School
    • Northampton Partnership Homes
    • BBC
    • Qatari Diar
    View projects

    What evidence should a proposed repair be checked against?

    Start with the finding and required performance, then compare proposed remediation options or designs. A contractor’s proposed detail is not automatically evidence that the original defect has been resolved.

    Defect records, design revisions, product evidence, procurement stage and agreed inspection points determine the instruction. Establish who installs, supplies certification and records concealed work before it is covered.

    You receive the agreed options, design comments and inspection findings, with any inaccessible or concealed work identified. The installer supplies the installation and certification records. Wider team work at Battersea Phase 3 included strategy and façade review.

    Turn fire-safety findings into a defined, reviewable remediation scope.

    A documented technical route from identified issue to scoped remediation evidence and review points.

    20+ years
    Senior team experience
    3 continents
    Team project experience
    £10B+
    Portfolio development value
    900+
    Completed projects

    Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.

    Scope your enquiry

    For owners and project teams translating fire-safety findings into remediation options, design decisions and evidence requirements.

    We review the proposed options or designs and provide inspection support where agreed. Installation and contractor certification are outside this service.

    Describe the defect, proposed works and procurement stage. A findings summary or photographs can start the discussion where the design or underlying report is still being assembled.

    Cladding and façade remediation consultancy

    We support building owners and design teams with the fire-engineering questions behind cladding and façade remediation: the risks identified, options proposed, evidence required and interfaces with the building's fire strategy.

    The written appointment defines the design review and inspection scope. Installation, product certification and the wider building-control application remain separate responsibilities. FRAEW and EWS1 requests are separately scoped.

    Scope at a glance

    Scoped: the instruction and exclusions are agreed in writing

    Evidence-led: unknowns and access limits stay visible

    Actionable: the output supports a defined project decision

    A list of defects is not yet a coordinated remediation design, procurement scope or verification plan.

    Technical consultancy supporting remediation option appraisal, design review, evidence requirements and scoped inspection during delivery.

    A documented technical route from identified issue to scoped remediation evidence and review points.

    FRA, FRAEW or survey actions need translating into a scope

    Design proposals need independent technical review

    Contractor submissions require fire-safety review

    Inspection hold points need defining

    Handover evidence is incomplete

    What you receive

    Findings and evidence review

    Remediation option and interface advice

    Performance requirement and design-review comments

    Inspection hold-point or witness plan within scope

    Handover evidence gap schedule

    How we scope and coordinate the work

    Decision-led scope

    Reviews are tied to defined design or procurement decisions.

    Interfaces exposed

    Dependencies between facade, compartmentation, structure and services are recorded.

    Evidence through handover

    Required records are considered before work becomes concealed.

    A scoped, documented technical process

    The question, available evidence, access and required output are agreed before a quotation is issued.

    Scope and exclusions agreed

    Evidence and limitations recorded

    Written output issued

    The output supports specified remediation decisions and evidence checks; installation and certification remain outside the scope.

    What this service does not include.

    Magnus provides consultancy, design review and inspection support; it does not install remediation works.

    Inspection support is limited to agreed visits and accessible work.

    No blanket certification or guarantee of contractor workmanship is provided.

    Designer, contractor and dutyholder responsibilities remain with those appointed parties.

    Buildings and uses this service scope suits.

    Developers and architects

    Housing associations

    Property management companies

    Building engineers and surveyors

    Insurance companies reviewing remediation evidence

    A coordinated process

    1. 01

      Review findings

      Confirm the underlying evidence and unresolved questions.

    2. 02

      Define requirements

      Set technical objectives, interfaces and evidence needs.

    3. 03

      Review design

      Comment on proposals within the agreed fire-safety scope.

    4. 04

      Inspect selectively

      Attend agreed hold points or witness inspections.

    5. 05

      Close evidence

      Record observations and outstanding handover gaps.

    How the evidence becomes a written output

    A simplified view of the sequence described above. The actual steps, inputs and outputs are confirmed in the written scope for your project.

    Three-step diagram: findings and proposed design, design review within scope, agreed inspection visits and handover evidence gaps
    Illustrative process for remediation support, not installation or certification. Magnus explanatory illustration.

    Major-project experience

    Our major-project work brings together a package of consultancy services. Explore these selected projects for their building context and our role. For your project, the service scope is agreed against its jurisdiction, stage and information available.

    • Sellafield Nuclear Facility

      Cumbria, UK

      Fire-engineering support across building packages within the Sellafield estate: site conditions, structural fire protection, compartmentation, fire stopping, doorset interfaces and fire-strategy coordination.

    • Battersea Power Station — Phases 1, 2 and 3

      London, UK

      Our team provided fire engineering consultancy on Phases 1, 2 and 3 of the Battersea Power Station redevelopment. On Phase 3, our work included fire engineering strategy and review of cladding and façades.

    • Hillingdon and Mount Vernon Hospitals

      London, UK

      Independent third-party fire-engineering review of refurbishment and reconditioning in operational hospitals.

    What we need from you to scope the work.

    Fire Safety Remediation Support

    Use this as a checklist before you ask for a quotation. Tick what you hold; unknown items can be listed as unknown. Nothing here is saved.

    Request a scoped quotation

    Before you enquire

    Underlying reports and defect schedules Drawings, specifications and proposed design Product and installation evidence available Procurement stage and project roles Required review or inspection decision

    Request a remediation review

    The people behind the advice

    Magnus Opifex Seven brings fire engineering, project governance and commercial judgement together. Alina Scarlat brings more than 22 years in fire safety and fire engineering as of November 2026, beginning with an apprenticeship in June 2004. Our team’s career project experience spans three continents. From existing buildings to healthcare estates, heritage assets and nuclear facilities, we turn complex fire-safety questions into written advice, coordinated requirements and practical next steps.

    Meet Magnus
    Alina Scarlat

    Alina Scarlat

    Technical Director

    Alina Scarlat, Technical Director, leads the engineering assessment, performance requirements, evidence review and technical conclusions.

    Nicoleta Vasile

    Nicoleta Vasile

    Founder, CEO and Chief Legal Officer

    Nicoleta Vasile, Founder, CEO and Chief Legal Officer, reviews legal and contractual risk as project decisions arise: applicable duties, appointment requirements, responsibility, authority to accept changes and escalation where material evidence remains unresolved. Romanian-qualified advocate (avocat), Bucharest Bar since 16 September 2009, with rights of audience before all Romanian courts and an LLM from City, University of London. UK client representation is separately scoped with an appropriately qualified UK adviser where required.

    Questions before commissioning

    Do you carry out the remediation works?

    No. This service is consultancy, design review and scoped inspection support, not installation.

    Does inspection mean the works are certified?

    No. Observations are limited to agreed visits, accessible areas and evidence supplied.

    Can you support external wall remediation?

    Yes, where the fire-engineering scope and interfaces are defined; FRAEW and any EWS1 question remain separate instructions.

    Define the remediation decision

    Send the underlying findings, current design information, project stage and the review or inspection support needed.

    Request a remediation review