Sellafield estate
Defined fire-engineering building packages, site and evidence reviews, and technical coordination.
Read project overviewAnalytics measures visits and actions. Separately, Google Ads can link a click to your enquiry and later qualification or contract. Both are optional; you can enquire without choosing.
Optional analytics measures visits and actions. With your permission, Google Ads measurement links an ad-click identifier to your enquiry and later recorded qualification or won decision. No personalised ads or email/phone matching. Enquiries remain available if you decline. You can change either choice at any time. See our Privacy policy.
Optional analytics measures visits and actions. With your permission, Google Ads measurement links an ad-click identifier to your enquiry and later recorded qualification or won decision. No personalised ads or email/phone matching. Enquiries remain available if you decline. You can change either choice at any time. See our Privacy policy.
Privacy choices, enquiry functions and requested account access.
If you grant advertising measurement here, a supported Google ad-click identifier and this notice revision are recorded with the server-observed landing and enquiry times for up to 30 days. They can link your enquiry to a later operator-recorded qualification or won decision for Google Ads measurement, only with a verified import destination. Email and phone matching and personalisation stay off. Changing this choice to off stops new measurement and requests withdrawal of linked permissions from this browser. Business enquiry records are not deleted. Older acceptance is not permission for this new linkage; save your current choice to opt in. See our Privacy policy.
Advertising measurement is off here. Server withdrawal is awaiting acknowledgement; reconnect to complete it.
Your browser’s privacy signal applies. Optional measurement is off.

Owners planning refurbishment or resolving missing records: establish the existing building’s fire-safety basis through a survey, separate condition report and evidence-led retrospective strategy.
Wider team experience · Battersea Phases 1–3; Phase 3 strategy and façade review.
The final strategy follows sufficient evidence and any agreed investigations; it is not retrospective approval.
Photograph: Battersea Power Station — Phases 1, 2 and 3 · wider fire-engineering experience
We will clarify your scope before preparing a written fee proposal.
Begin with records and an accessible survey, then a separate fire safety condition report. Reconstruct the basis for current configuration and use; do not treat a proposed layout as proof of existing construction.
Size, past alterations, record gaps, survey access and targeted investigations determine the stages quoted. Opening-up and specialist evidence are agreed where a material conclusion cannot otherwise be supported.
You receive a register of observed conditions, assumptions and gaps, followed by a strategy once the necessary evidence is available. The condition report is a separate stage; reconstructing a strategy does not grant retrospective approval.
Missing records, altered layouts and uncertain fire precautions can make an existing building difficult to manage or refurbish. Magnus reviews the evidence, surveys accessible conditions and develops a strategy that explains how fire safety should work in the building’s current configuration and use.
Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.
Selected wider commissions show how our team works on complex buildings. The project overviews explain the role and scope of each appointment.
Defined fire-engineering building packages, site and evidence reviews, and technical coordination.
Read project overviewOur team provided fire engineering consultancy on Phases 1, 2 and 3 of the Battersea Power Station redevelopment. On Phase 3, our work included fire engineering strategy and review of cladding and façades.
Read project overviewIndependent third-party fire-engineering review of refurbishment and reconditioning in operational hospitals.
Read project overviewA retrospective fire strategy brings the building’s escape arrangements, fire-resisting construction, protection systems and management requirements into one coordinated account. Historic records help explain how the building developed. The decision concerns the building that exists now.
The service is useful when the original strategy is missing, changes have overtaken it, an assessment has identified conflicting information, or refurbishment and due diligence require a reliable starting point. We work with building owners, operators, employers, landlords, managing agents and project teams.
An evidence and drawing register; the initial fire safety condition report; an investigation brief where needed; review of returned investigation evidence; and the final retrospective fire strategy with recommendations and dependencies. The proposal identifies the stages included and the information needed to complete each stage.
Residential and mixed-use buildings, offices and commercial premises, hotels, healthcare buildings, industrial facilities and heritage properties. Specialist occupancies require a project-specific scope and competence review.
A fire risk assessment identifies fire hazards, people at risk and the adequacy of physical fire precautions and management arrangements. The retrospective strategy explains the coordinated fire-safety approach for the existing building. The two inform each other; one does not replace the other.
For relevant premises in England and Wales, ongoing fire-risk assessment duties arise under the Fire Safety Order. Additional duties depend on the building and jurisdiction. The Building Safety Act does not create a universal requirement for every existing building to commission a report with this title.
01
We review available plans, strategies, assessments and maintenance information, then undertake an accessible, visual, non-intrusive fire-safety survey. Access restrictions and concealed construction are recorded.
02
This separate report sets out the observed condition, relevant deficiencies, inconsistencies and evidence gaps. It gives the owner a practical account of what is known and what needs attention.
03
If a material conclusion depends on concealed construction or specialist evidence, we identify the question, the investigation purpose and the locations or systems to examine. Opening-up is proportionate to the uncertainty; it is not automatically necessary everywhere.
04
Appointed competent parties carry out agreed intrusive surveys, testing or specialist investigations. Magnus reviews their findings and resolves the implications for the strategy. Conclusions that depend on missing evidence remain open until enough information is available.
05
The report addresses means of escape and evacuation, internal and external fire spread, structural fire resistance, active and passive precautions, fire-service access and facilities, and management arrangements within the agreed scope. Recommendations, dependencies and remaining limitations are clear.
06
Owners and other dutyholders implement the agreed actions, maintain precautions and review the strategy when the building or its use changes. Magnus can provide separately scoped follow-on design or review support.
Start with the address, current use, approximate size and the reason you need the strategy. Share drawings or previous reports if available. You do not need a complete archive before contacting us; the first review identifies what is missing.
Request a retrospective strategy quoteMagnus Opifex Seven brings fire engineering, project governance and commercial judgement together. Alina Scarlat brings more than 22 years in fire safety and fire engineering as of November 2026, beginning with an apprenticeship in June 2004. Our team’s career project experience spans three continents. From existing buildings to healthcare estates, heritage assets and nuclear facilities, we turn complex fire-safety questions into written advice, coordinated requirements and practical next steps.
Meet Magnus
Technical Director
Alina Scarlat, Technical Director, leads the engineering assessment, performance requirements, evidence review and technical conclusions.

Founder, CEO and Chief Legal Officer
Nicoleta Vasile, Founder, CEO and Chief Legal Officer, reviews legal and contractual risk as project decisions arise: applicable duties, appointment requirements, responsibility, authority to accept changes and escalation where material evidence remains unresolved. Romanian-qualified advocate (avocat), Bucharest Bar since 16 September 2009, with rights of audience before all Romanian courts and an LLM from City, University of London. UK client representation is separately scoped with an appropriately qualified UK adviser where required.
Projects may need several coordinated instructions; these are not automatically included in every appointment.
Not always. The initial survey identifies whether particular decisions require intrusive or specialist investigation. Any investigation is agreed before it proceeds.
No. It records the initial findings and evidence gaps. The final strategy follows the review of sufficient evidence, including agreed investigations where necessary.
Yes. We first establish what can be evidenced from the available records and survey, then define the additional work needed.
The strategy is professional advice for the agreed building and scope. It is not retrospective building-control approval or certification; dutyholders and relevant authorities retain their responsibilities.
Building size, complexity, records, access and investigation needs. The written proposal sets out the stages, fee basis and dependencies.
This is a blank Magnus example. An assessor’s finding has a reference and location. The register links it to the agreed action, the person responsible, the due date and the evidence needed at review.
For a strategy, the design team also records assumptions and the evidence needed to resolve gaps.
Illustrative worksheet
The commissioning team uses this blank Magnus worksheet to prepare the retrospective strategy brief.
Ask about a relevant reference or anonymised deliverable; we check availability and permission to share.
Tell us what the building is used for and why the strategy is needed. We will review the starting information and define a proportionate proposal.
Request a retrospective strategy quote