Scope point 01
Scope stated first
What is reviewed, designed or excluded is agreed in writing before work starts.
Water, drainage and pipework advice for better coordinated building projects.
Scoped
the instruction and exclusions are agreed in writing
Evidence-led
unknowns and access limits stay visible
Actionable
the output supports a defined project decision
Public health engineering covers the water services, drainage and pipework within a building. This service provides consultancy: defining requirements, reviewing design information and coordinating interfaces with the wider design team.
The scope of each appointment is agreed in writing. Calculations, drawings, specifications, BIM models and site visits are included only where they are explicitly appointed as deliverables.
Pipe routes, risers and service penetrations interact with compartmentation and the fire strategy, so those interfaces are coordinated as part of the review rather than left to site resolution.
Typical scope, subject to the agreed appointment: domestic hot and cold water distribution advice, including the demand, pressure and storage inputs the design needs; above-ground foul, soil, waste and rainwater drainage advice; pipe routes, riser space, access and maintainability; and water-efficiency options where the brief asks for them.
When this service is useful
Magnus Opifex Seven provides consultancy for building water services, drainage and pipework coordination. We help architects, developers, building owners and project teams define requirements, review design information and resolve interfaces with the wider building design.
Primary outcome
A written consultancy output for the agreed appointment, with requirements, information gaps, options and coordination actions clearly recorded.
Design information for water or drainage needs an independent review
Risers, plant space or pipe routes conflict with other disciplines
An existing building's water services or drainage need assessing before alterations
Service penetrations need coordinating with compartmentation and the fire strategy
The project team needs requirements defined before detailed design
Typical outputs for this service are listed below. The exact format — report, review notes, survey record or technical position — is confirmed in the agreed appointment, and each records the information supplied, the assumptions used and the limitations that apply.
The scope is set from the building facts, drawings, jurisdiction, project stage and the question the written output needs to answer.
Scope point 01
What is reviewed, designed or excluded is agreed in writing before work starts.
Scope point 02
Penetrations, risers and plant interfaces are recorded against the fire strategy and compartmentation.
Scope point 03
Missing information is listed in a gap schedule rather than filled with assumptions.
Every stage records what has been supplied, what remains open and what the report can and cannot conclude.
01
Agree the question, project stage, information held and required output.
02
Review drawings and design information against the agreed scope.
03
Identify interfaces with structure, architecture, other services and the fire strategy.
04
Set out options and the information still needed.
05
Provide the agreed written output and coordination register.
A simplified view of the sequence described above. The actual steps, inputs and outputs are confirmed in the written scope for your project.
Recorded basis
The question, available evidence, access and required output are agreed before a quotation is issued.
Result
This is a scope and process record, not a completed project: the output follows the agreed appointment and records exclusions and information gaps.
Public Health Engineering Consultancy
Use this as a checklist before you ask for a quotation. Tick what you hold; unknown items can be listed as unknown. Nothing here is saved.
Building water services, above-ground foul, soil, waste and rainwater drainage, and the pipework, routes and risers that serve them. Below-ground and external drainage responsibility is defined in each scope.
Consultancy. We review, advise and, where appointed, prepare defined design documentation. We do not install, maintain or repair plumbing systems.
Yes, where the scope is agreed. The review is based on the information supplied and, if appointed, a site visit; limitations are recorded.
Pipe routes, risers and penetrations are checked against compartmentation and fire-strategy interfaces, and coordination actions are recorded in the register.
Only where BIM deliverables are explicitly agreed in the appointment. It is scope-dependent and not a default output.
The fee depends on the brief, project stage, information available and required output. It is confirmed in a written quotation.
Request a written scope
Send the project location, building use, stage, the problem to resolve, the output needed, available drawings and your timeframe.
Related services
Use these links when the building question also involves design strategy, operational risk, regulatory route mapping or evidence coordination.
Fire strategy reporting for UK projects
Fire strategy reports for new builds, refurbishments and changes of use across the UK. Send drawings and project details for a scoped quotation.
Explore Fire StrategyPassive fire protection inspection
Fire compartmentation surveys, visible or intrusive, with location-referenced observations, access limits and prioritised actions. Request a written survey scope.
Explore Compartmentation SurveysFire-safety remediation consultancy
Fire-safety remediation support: turn FRA, FRAEW or survey findings into a reviewable scope, with design review and agreed inspection hold points through handover.
Explore Remediation SupportFire Safety & Fire Engineering Consultancy — London, UK
From concept design to regulatory compliance, our fire engineering scope covers fire strategy, fire risk assessment, CFD smoke modelling and Building Safety Act 2022 support. Send project details for a scoped quotation.
Nicoleta Vasile, Baroness of Brattleby
Founder & CEO · Chief Legal Officer · Romanian-qualified Lawyer
Alina Scarlat
Technical Director & Fire Engineer (BEng)
Răzvan Vasile
Co-Founder & Chief Financial and Strategy Officer
Head Office: 167-169 Great Portland Street, 5th Floor, London W1W 5PF
© 2026 Magnus Opifex SEVEN LTD. All rights reserved.