    Building Safety Case Fire-Engineering Support

    Principal Accountable Persons receive a fire-engineering contribution to the safety case for an occupied higher-risk building in England.

    Open the safety-case working schedule to see each evidence item alongside its official source.

    Photograph: Battersea Power Station · wider team fire-engineering experience, not evidence of this service instruction

    Discuss your building safety case

    We will clarify your scope before preparing a written fee proposal.

    Add project details or phone (optional)

    Briefly describe the building, proposed work or decision. Do not include confidential information or attach documents here.

    Your role (optional)

    No obligation. Your details help us scope the work properly. We’ll respond by email.

    Prepare a detailed project brief

    Selected clients and project experience

    • Sellafield Nuclear Facility
    • Battersea Power Station
    • Co-op Live
    • Wimbledon Quarter
    • The Triangle
    • Google Data Centres (3)
    • Google Bay View (HQ)
    • Novotel
    • Westminster City Hall
    • Chelsea and Westminster Hospital
    • Wembley Stadium
    • Tottenham Hotspur Stadium
    • Etihad Stadium (Manchester City)
    • Stamford Bridge (Chelsea FC)
    • Craven Cottage (Fulham FC)
    • Sports Stadium 2, Qatar
    • Allianz Stadium, Twickenham
    • Emirates Stadium (Arsenal)
    • King Power Stadium (Leicester City)
    • Coca-Cola
    • Network Rail
    • TATA Group
    • Bain & Company
    • UBS
    • McLaren Group
    • Romulus Construction
    • Hermes
    • Collins Construction
    • Southwark Council
    • UAL — University of the Arts London
    • St Paul's Girls' School
    • Northampton Partnership Homes
    • BBC
    • Qatari Diar
    View projects

    Which fire evidence is missing from an occupied building’s safety case?

    For an occupied higher-risk building in England, agree the fire-engineering contribution needed by the Principal Accountable Person. The appointment covers that contribution; the complete safety case report and structural analysis require their own inputs.

    Building details, the evidence register, existing strategy, report draft and identified fire-spread questions determine the review. Separate unknown construction evidence from information that is held but has not yet been integrated.

    You receive the agreed fire-hazard, control and evidence-gap information for integration by the Principal Accountable Person. A working schedule helps organise the supporting records; issuing the safety case and obtaining a regulator decision remain separate steps.

    Organise the fire-safety evidence that supports an occupied higher-risk building's safety case.

    A documented fire-engineering contribution that the Principal Accountable Person can integrate with structural input and the wider safety case report.

    20+ years
    Senior team experience
    3 continents
    Team project experience
    £10B+
    Portfolio development value
    900+
    Completed projects

    Experience reflects the senior team’s careers. Full development values of projects represented in the portfolio; Magnus delivered defined fire-engineering scopes. The 900+ figure covers completed projects across the Magnus portfolio, not clients or individual-service totals.

    Scope your enquiry

    For Principal Accountable Persons and their teams addressing fire-spread evidence in an occupied higher-risk building in England.

    A scoped fire-engineering contribution records hazards, controls and evidence gaps for integration by the PAP, not the whole safety case or structural analysis.

    Start with the building details, PAP arrangements and the fire-safety question. Share any evidence register or report draft held; a completed safety case is not required to begin scoping.

    An occupied-building duty, not Gateway 2

    This service concerns occupied higher-risk buildings in England. It is distinct from the building control approval route for higher-risk building work.

    The Principal Accountable Person prepares and keeps the safety case report. Magnus can contribute fire-engineering analysis; competent structural input and the wider management evidence remain separate responsibilities.

    Scope at a glance

    Scoped: the instruction and exclusions are agreed in writing

    Evidence-led: unknowns and access limits stay visible

    Actionable: the output supports a defined project decision

    A safety case must address both fire spread and structural failure; a fire-only evidence pack cannot stand in for the Principal Accountable Person's whole-building case.

    Scoped fire-engineering input to the safety case and safety case report, including fire-risk evidence, control measures, gaps and interfaces with structural-safety evidence.

    A documented fire-engineering contribution that the Principal Accountable Person can integrate with structural input and the wider safety case report.

    Safety case evidence is fragmented

    Fire and structural interfaces are unclear

    The safety case report needs a fire-engineering contribution

    Changes or incidents require the evidence position to be reviewed

    The Principal Accountable Person needs a gap schedule

    What you receive

    Fire-safety evidence inventory and gap schedule

    Fire spread hazard and control narrative within scope

    Interfaces requiring structural or other specialist input

    Assumptions, limitations and evidence ownership matrix

    Technical review support for the fire-engineering contribution

    How we scope and coordinate the work

    Fire contribution clearly bounded

    The fire-engineering scope is separated from structural and management evidence.

    Evidence ownership

    Every gap is assigned to an evidence owner rather than silently absorbed.

    Report-ready structure

    Outputs are organised around the decision the wider safety case must explain.

    A scoped, documented technical process

    The question, available evidence, access and required output are agreed before a quotation is issued.

    Scope and exclusions agreed

    Evidence and limitations recorded

    Written output issued

    The output is a scoped fire-engineering contribution; the Principal Accountable Person retains the whole safety case and report responsibility.

    What this service does not include.

    The Principal Accountable Person retains responsibility for preparing and keeping the safety case report.

    The statutory scope addresses fire spread and structural failure; structural analysis requires separately appointed competent input.

    This is not Gateway 2 support, a regulator submission or legal advice.

    No acceptance, timetable or regulatory outcome is guaranteed.

    Buildings and uses this service scope suits.

    Principal Accountable Persons

    Housing associations

    Property management companies

    Building engineers and surveyors supporting occupied HRBs

    A coordinated process

    1. 01

      Confirm scope

      Confirm the occupied HRB context and the fire-engineering instruction.

    2. 02

      Map evidence

      Inventory evidence, owners and structural interfaces.

    3. 03

      Review fire risks

      Examine fire-spread hazards and controls within scope.

    4. 04

      Document gaps

      Record missing, conflicting or ageing evidence.

    5. 05

      Support integration

      Issue the contribution for PAP-led integration and review.

    How the evidence becomes a written output

    A simplified view of the sequence described above. The actual steps, inputs and outputs are confirmed in the written scope for your project.

    Three-step diagram: occupied building safety case evidence, fire-spread controls and structural interfaces, fire-engineering input for the Principal Accountable Person
    Illustrative process for safety case fire-engineering support, not a whole safety case. Magnus explanatory illustration.

    Major-project experience

    Our major-project work brings together a package of consultancy services. Explore these selected projects for their building context and our role. For your project, the service scope is agreed against its jurisdiction, stage and information available.

    • Sellafield Nuclear Facility

      Cumbria, UK

      Fire-engineering support across building packages within the Sellafield estate: site conditions, structural fire protection, compartmentation, fire stopping, doorset interfaces and fire-strategy coordination.

    • Battersea Power Station — Phases 1, 2 and 3

      London, UK

      Our team provided fire engineering consultancy on Phases 1, 2 and 3 of the Battersea Power Station redevelopment. On Phase 3, our work included fire engineering strategy and review of cladding and façades.

    • Hillingdon and Mount Vernon Hospitals

      London, UK

      Independent third-party fire-engineering review of refurbishment and reconditioning in operational hospitals.

    What we need from you to scope the work.

    Building Safety Case Fire-Engineering Support

    Use this as a checklist before you ask for a quotation. Tick what you hold; unknown items can be listed as unknown. Nothing here is saved.

    Request a scoped quotation

    Related reading

    Before you enquire

    Building registration and key building information held Current safety case and report drafts Fire strategy, FRA, surveys and incident records Structural safety information and named specialist interfaces Accountable Person arrangements and requested decision

    Discuss your building safety case

    The people behind the advice

    Magnus Opifex Seven brings fire engineering, project governance and commercial judgement together. Alina Scarlat brings more than 22 years in fire safety and fire engineering as of November 2026, beginning with an apprenticeship in June 2004. Our team’s career project experience spans three continents. From existing buildings to healthcare estates, heritage assets and nuclear facilities, we turn complex fire-safety questions into written advice, coordinated requirements and practical next steps.

    Meet Magnus
    Alina Scarlat

    Alina Scarlat

    Technical Director

    Alina Scarlat, Technical Director, leads the engineering assessment, performance requirements, evidence review and technical conclusions.

    Nicoleta Vasile

    Nicoleta Vasile

    Founder, CEO and Chief Legal Officer

    Nicoleta Vasile, Founder, CEO and Chief Legal Officer, reviews legal and contractual risk as project decisions arise: applicable duties, appointment requirements, responsibility, authority to accept changes and escalation where material evidence remains unresolved. Romanian-qualified advocate (avocat), Bucharest Bar since 16 September 2009, with rights of audience before all Romanian courts and an LLM from City, University of London. UK client representation is separately scoped with an appropriately qualified UK adviser where required.

    Questions before commissioning

    Do you prepare the whole safety case report?

    Not by default. We provide a scoped fire-engineering contribution; the Principal Accountable Person retains responsibility for the report and wider evidence.

    Does a safety case only cover fire risk?

    No. The occupied higher-risk regime addresses both the spread of fire and structural failure.

    Is this Gateway 2 support?

    No. Gateway 2 concerns building control approval for higher-risk building work; this service concerns the in-occupation safety case.

    What affects the cost of building safety case support?

    The scope depends on the building, the quality of existing records, the fire-risk questions, gaps in surveys and the interfaces with structural and management evidence. Send the existing report and evidence register for a quotation covering the agreed fire-engineering contribution.

    Define the fire-engineering contribution

    Send the building details, current evidence register, safety case material and the specific gap or decision requiring support.

    Discuss your building safety case