Magnus Opifex Seven logo
    ← ServicesEXPERT WITNESS · CONFLICT CHECK REQUIRED

    Fire Engineering Expert Witness Services

    Independent technical analysis within a clearly defined field of expertise.

    Scoped

    the instruction and exclusions are agreed in writing

    Evidence-led

    unknowns and access limits stay visible

    Actionable

    the output supports a defined project decision

    When this service is useful

    Technical opinion must remain independent, evidence-based and within the instructed expert's demonstrable competence.

    Matter-specific technical review and evidence, accepted only after instructions, conflicts, competence, information and timetable have been reviewed.

    Primary outcome

    A clearly scoped independent technical work product, where the instruction passes conflict and competence review.

    A dispute turns on a fire-engineering question

    Historic design or assessment evidence needs independent review

    Technical allegations and documents need organising

    A joint technical issue requires a bounded opinion

    Solicitors or insurers need an initial competence and conflict check

    What your report includes

    Written outputs depend on the agreed scope.

    The report records the information supplied, the assumptions used, the limitations that apply and the actions or technical position within the agreed service scope.

    Initial instructions, conflict and competence review

    Technical document and evidence schedule

    Independent opinion within the agreed fire-engineering scope

    Questions, assumptions and limitations register

    Meeting or report support only where expressly instructed

    How we scope and coordinate the work

    The service is defined before the fee is quoted.

    The scope is set from the building facts, drawings, jurisdiction, project stage and the question the written output needs to answer.

    Scope point 01

    Conflict check first

    No substantive instruction begins before relevant parties are checked.

    Scope point 02

    Competence matched to issue

    The technical question is tested against evidenced, matter-specific competence.

    Scope point 03

    Independence explicit

    The opinion is separated from the instructing party's desired outcome.

    From enquiry to written report

    A clear sequence from information request to issued output.

    Every stage records what has been supplied, what remains open and what the report can and cannot conclude.

    01

    Conflict check

    Identify parties and potential conflicts.

    02

    Review instructions

    Test questions, competence, forum and timetable.

    03

    Review evidence

    Build the technical evidence schedule and identify gaps.

    04

    Analyse

    Prepare independent reasoning within scope.

    05

    Issue

    Provide the agreed work product subject to applicable instructions.

    Recorded basis

    A scoped, documented technical process

    The question, available evidence, access and required output are agreed before a quotation is issued.

    Scope and exclusions agreed
    Evidence and limitations recorded
    Written output issued

    Result

    Acceptance and output remain subject to conflicts, scope and matter-specific evidenced competence; no legal or case outcome is promised.

    Information needed for a quotation

    What we need from you to scope the work.

    • Instructing party and all relevant parties for conflict checks
    • Jurisdiction, forum and procedural context
    • Clear technical questions and proposed timetable
    • Pleadings, reports, drawings and contemporaneous records available
    • Any proposed expert duties or report requirements
    Scope boundaries

    What this service does not include.

    • Every instruction is subject to conflict and matter-specific competence review.
    • No legal advice, advocacy or guaranteed litigation outcome is provided.
    • Acceptance depends on the technical questions, available evidence, forum, timetable and applicable expert duties.
    • Work outside the expert's evidenced competence is declined or requires another specialist.
    Suitable scope examples

    Buildings and uses this service scope suits.

    These are examples of building types, uses and project contexts for which this service scope is suitable. They are scope examples, not a client list or a record of completed instructions.

    • Solicitors acting for developers, owners or contractors
    • Insurance companies
    • Building engineers and surveyors involved in technical disputes
    • Architects or property managers requiring independent technical review

    Questions about this service

    Do you give legal advice?

    No. The service is independent technical fire-engineering evidence; legal advice remains with the instructing lawyers.

    Will you accept every instruction?

    No. Acceptance depends on conflicts, matter-specific competence, information, scope and timetable.

    Can you guarantee the case outcome?

    No. An independent expert does not guarantee or advocate for an outcome.

    Request a written scope

    Submit the technical questions for review

    Provide the parties, jurisdiction, instructions, timetable and available evidence so conflicts and competence can be checked before scope.

    MO7

    Magnus Opifex SEVEN LTD

    Fire Safety & Fire Engineering Consultancy — London, UK

    Ready to Protect Your Next Project?

    From concept design to regulatory compliance, our fire engineering scope covers fire strategy, fire risk assessment, CFD smoke modelling and Building Safety Act 2022 support. Send project details for a scoped quotation.

    Founders & Leadership

    NS

    Nicoleta Vasile, Baroness of Brattleby

    Founder & CEO · Chief Legal Officer · Romanian-qualified Lawyer

    AS

    Alina Scarlat

    Technical Director & Fire Engineer (BEng)

    RV

    Răzvan Vasile

    Co-Founder & Chief Financial and Strategy Officer

    Head Office: 167-169 Great Portland Street, 5th Floor, London W1W 5PF
    © 2026 Magnus Opifex SEVEN LTD. All rights reserved.

    Send Inquiry

    Project enquiry · Written reply

    0/3000